Surface preparation :
-
1Apply the product to a surface that is clean, dust-free, grease-free and dry.
-
2In case of races of efflorescence, laitance or cement bloom: Clean using Guard Cleaner® Surface Preparation to allows the elimination. Repeat the operation in case of persistent traces. This step also open up the porosity of the concrete and allow optimum grip of the protection.
-
3Rinse carefully with a pressure washer until the surface is free from all traces of the cleaner. Wait for complete drying through, approximately 24/48 hours before treatment.
Application :
• The treated surface should be impregnated to saturation point in one application.
• Allow the product to penetrate and dry (10 to 60 minutes depending on the porosity and temperature of the material).
• Do not over apply, eliminate any exceeding product before drying.
• On vertical surfaces, apply from the bottom-up.
• Surface dries in 1 hour.
• The surface must be protected from traffic and liquids (rain, grease, etc.) for 24 hours
• Optimum effectiveness obtained after 7 days.
