Surface preparation :
-
1Apply the product to concrete that has been freshly demoulded for more than 24 hours. The surface must be clean, free of dust, efflorescence and mould release oil residues.
-
2If the surface requires prior cleaning for the reasons mentioned above, clean with Guard Cleaner
-
3On concrete that has dried for more than 48 hours, cleaning must be carried out. Rinse carefull with a pressure washer until the surface is free from all traces of the cleaner.
-
4Allow to dry for at least 12 hours before applying the protection.
Application :
- Mix the product for at least 3 minutes using a mechanical agitator to homogenise the product.
- Apply from the bottom up in 2 criss-cross
coats. - Drying time between coats: 15 to 30 minutes.
Do not overload the substrate, remove any excess before drying. - Protected drying and palletisation time under
film: 24 hours. - Optimum effectiveness obtained after 7 days.