Surface preparation :
-
1Apply the product to concrete that has been freshly demoulded for more than 24 hours. The surface must be clean, free of dust, efflorescence and mould release oil residues.
-
2On concrete that has dried for more than 48 hours, cleaning must be carried out.
-
3Rinse carefully with a pressure washer until the surface is free from all traces of the cleaner.
-
4Allow to dry for at least 12 hours before applying the protection.
Application :
Use neat – do not dilute.
• Shake the product well before use
• Apply to saturation in two wet-on-wet coats.
• On vertical surfaces, apply from the bottom up;
Do not overload the surface, remove anyexcess before drying.
• Protected drying and palletisation time under
film: 24 hours.
• Optimum effectiveness obtained after 7 days
Do not apply to concrete with very low porosity, polished, glazed, organic, metallic or waterproofing materials.
-