Surface preparation :
-
1Always apply the product to clean, sound and dry wood.
Application :
Shake the package well for 5 minutes before
use.
• Apply the first coat to the substrate. Once
dry to the touch (15 to 60 minutes), apply the
second coat.
On vertical surfaces, apply from the bottom
up.
• Do not overload the support, apply a thin layer,
taking care to pull the product well.
• Drying time: 24 hours.
• Optimum effectiveness obtained after 7 days.
-
1L
