FREE CATALOGUE NEWS
Hillhead Quarry & Recycling Exhibition 19-21 June
Le 18-05-2012Advert about ProtectGuard in Le Moniteur (April 2012)
Le 02-05-2012Advert about WoodGuard Color Professional in Eco Maisons Bois (April 2012)
Le 02-05-2012 NEWSLETTER
Le 18-05-2012Advert about ProtectGuard in Le Moniteur (April 2012)
Le 02-05-2012Advert about WoodGuard Color Professional in Eco Maisons Bois (April 2012)
Le 02-05-2012 NEWSLETTER
Protection products

Permanent graffiti coating for concrete and porous stone AntiGraffiti Guard Special Concrete
Product application
-> Back to the technical manual

Preferably use an HLVP spray unit. You can also use a brush or roller.
PRECAUTIONS :
- Applying AntiGraffiti Guard Special Concrete can alter the substrate‘s appearance. It is thus necessary to apply a test application first on a small hidden part.
- Do not apply during rain or frost and when surface and air temperature is < 5°C & > 30°C.
- Keep in a dry place (between 5°C and 30°C).
- Storage: 12 months following the production date when kept in the original unopened container.
APPLICATION
- Always carry out a test application on a small portion of the substrate.
- Substrates must always be clean, dust-free and dry. Preparation of the substrate before application of AntiGraffiti Guard Special Concrete is an important function of the coating's final appearance and performance, including the product's surface adhesion.
Base Formula
- Apply AntiGraffiti Guard Special Concrete base with a brush or HVLP spray unit in order to enhance adhesion (consumption: 10 - 15 m2 per litre). Wait > 4 hours and < 24 hours before applying AntiGraffiti Guard Special Concrete.
Preparation of AntiGraffiti Guard Special Concrete
- Thoroughly stir part A (base) of the product with an electric agitator before use, in order to obtain a homogeneous liquid. Then add part B (hardener) to part A while it is being agitated. Lightly mix with an electric mixer for at least 5 minutes.
- Allow it to settle in the open air for half an hour, and then homogenate with the electric mixer before applying. The mix can be used for upto 4 hours at a room temperature < 20°C.
Application
- Apply a first application of A+B, but not too heavy, on surfaces pre-treated with the base formula. In the case of high temperature, this first application can be diluted with 10% of clean water. Make sure the mix is homogeneous.
- Allow to dry for one hour before applying the second application (at an ambient 20°C temperature).
- Protect treated surface while drying: 24 hours.
- Optimum effect obtained after 5 to 7 days.
- Clean equipment with water immediately after use.
APPLICATION EQUIPMENT

Preferably use an HLVP spray unit. You can also use a brush or roller.













